Overhead Ratio and PUE

Total energy at the outer boundary divided by energy at the inner boundary. For a data center, M4 over M3, it equals power usage effectiveness (PUE). Lower is better, and it can never be below 1.

Reviewed 3 November 2026

The formula

OR = E(M4) / E(M3)

Calculated from energy over a stated period, not from instantaneous power, following the definitions of ISO/IEC 30134-2:2026, published in January 2026.

Rules that keep it honest

  • Annual claims need at least 12 months of integrated energy.
  • A ratio that leaves out part of the facility is labeled "partial".
  • For systems other than data centers, the ratio is labeled a "PUE analog".

Reference points

Overhead Ratio reference points
ReferenceValueSource
Google fleet, trailing twelve months1.09 through 2025 and the first half of 2026Google data-center efficiency page
EU rating scheme, energy grade APUE of 1.15 or lessLatham & Watkins, 25 September 2026
EU rating scheme, energy grade GPUE above 1.9Latham & Watkins, 25 September 2026

Why the ledger matters here

A PUE says nothing about whether the IT energy did useful work. The Joule Ledger pairs the Overhead Ratio with Decision Yield at M3, so a facility cannot look efficient while running idle servers.

Questions

What is a good PUE?

Lower is better. Under the EU rating scheme adopted in September 2026, an A energy grade needs a PUE of 1.15 or less (Latham & Watkins, 25 September 2026).

Sources

  1. ISO/IEC 30134-2:2026
  2. Google data-center efficiency page
  3. Latham & Watkins, 25 September 2026

Keep reading

Take the next step.

The JL-26 Overhead Ratio, facility energy over system energy: equal to PUE for data centers, calculated from energy over a period per ISO/IEC 30134-2:2026.