AAERLRequest a briefing

Guides

Plain, sourced guides for engineers, operators and sustainability teams who need energy figures that hold up.

Reviewed 5 November 2026

EU rules

The EU data-center rating scheme

A-to-G grades for energy and water, adopted 21 September 2026.

Read the guide

EU reporting crosswalk

How the Joule Ledger relates to the EU rating criteria and reporting indicators.

Read the guide

Prices and terms

What each AAERL offer costs, with its annual limit.

See prices

Measurement

How to measure AI inference energy

Eight steps, from task set to report.

Read the guide

AI energy benchmarks compared

MLPerf Power, the AI Energy Score and ML.ENERGY, and what each measures.

Read the guide

How energy metrics get gamed

Five ways figures mislead, and how to spot them.

Read the guide

Ratios and context

PUE, WUE and CUE explained

The three facility ratios, their formulas and their limits.

Read the guide

Data-center electricity use

The US and global figures, who produced them and why they differ.

Read the guide

Scope 2: location vs market

Where energy ends and emissions factors begin.

Read the guide

Claims and buying

Substantiating AI energy claims

EU Directive 2024/825, the FTC Green Guides and a boundary checklist.

Read the guide

Procurement energy questions

What to ask suppliers of colocation, cloud and GPU capacity.

Read the guide

Energy report checklist

What a credible energy report must contain, in order.

Read the guide

Questions

Who writes these guides?

AAERL. Each guide cites its sources and shows when it was last reviewed. They are general information, not legal advice.

Keep reading

Take the next step.

Plain, sourced guides to measuring AI and data-center energy: the EU rating scheme, EU reporting, inference energy, benchmarks and how metrics get gamed.